Construction ongoing
Tatu City
Jabali Towers
Two towers of 25 and 36 storeys in Tatu City's urban core, now under construction, with a hotel, Grade A offices and 35 shops and restaurants at their feet.
from KES 16,900,000
Muthangari · Construction ongoing
Luxury begins before you even reach your door
The residence
Golden Hill stands in Muthangari, on the edge of Karura Forest, and is built around a single idea carried to an unusual conclusion: that the experience of a home begins at the threshold of the building, not the threshold of the flat. Every residence has its own elevator lobby. Every residence has a second, discreet corridor for staff and deliveries, so the household's working life never crosses its social one.
from KES 39,400,000
Indicative conversion, reference rates dated 30 August 2026. Settlement is in Kenya Shillings.
The long read
A long-form reading of the building: the threshold, the private lift lobby, and all four plans drawn to one scale so you can see 230 against 515 square metres.
The lobby is finished in warm tones with a professional concierge on duty, and private lounges sit off it for residents receiving guests. Each residence is served by its own elevator hall and its own high-speed cabin, so a journey home is never shared. Underground parking runs at an average of two spaces per household, with separated access and egress.
The four types are not variations on a floor plate; they are four different propositions. Type B is the most compact at approximately 230 m², arranged for a family that entertains. Type C, at approximately 288 m², is organised as a circular flow around a panoramic lounge. Type A, at approximately 380 m², adds a fourth bedroom, a study with its own bathroom and a second kitchen. Type D, at approximately 515 m², is served by two lifts and two entrance foyers, and is offered in limited numbers.
Type B, at 230.47 m², runs from KES 39.4M to KES 53.6M depending on floor. Type C, at 287.97 m², from KES 51.1M to KES 66.9M. Type A, at 379.39 m², from KES 65.7M to KES 96.7M. The Type D penthouse, at 514.82 m², starts at KES 126M, and there are only two of them in the whole development. Reservation is KES 1M, followed by a 20 per cent deposit on signing, with the balance in instalments across the construction period. Completion is expected in November 2028.
Types A and D carry both an enclosed kitchen and an open one. The closed kitchen takes the heat, the smoke and the noise of real cooking; the open kitchen faces the room and takes the guests. It is a Kenyan and pan-African way of cooking that most apartment plans quietly refuse to allow for.
Layouts
Type B
230.47 m²
from KES 39,400,000
Type C
287.97 m²
from KES 51,100,000
Type A
379.39 m²
from KES 65,700,000
Type D
514.82 m²
from KES 126,000,000
Specification
Gallery









Images are the developer's architectural renders and floor plans unless the residence is complete, in which case they are photographs of the actual building. Renders illustrate design intent; finishes and landscaping may differ on delivery.
Also represented
Construction ongoing
Tatu City
Two towers of 25 and 36 storeys in Tatu City's urban core, now under construction, with a hotel, Grade A offices and 35 shops and restaurants at their feet.
from KES 16,900,000
Construction ongoing
Tatu City
Twenty-four buildings around a landscaped courtyard, on the edge of the only urban wildlife sanctuary in the world.
from KES 7,600,000
Construction ongoing
Westlands
One, two and three-bedroom residences in Westlands, with duplexes occupying the twenty-first and twenty-second floors.
from KES 6,600,000